11/06/2026
ALPINE - Working at height, out of sight.
Our team has just completed this Layher Allround installation inside the V&A Waterfront shopping centre, giving safe access to the roof structure high above the mall floor.
The real challenge wasn't the scaffold. It was building it without anyone noticing.
With thousands of shoppers moving through the centre every day, disruption wasn't an option. So our crews worked after hours, erecting through the night so that by the time the doors opened each morning, the mall traded as normal — clean floors, clear walkways, no interruptions.
That's the advantage of the Layher system: rapid assembly, suspended configurations over live public spaces, and engineered safety at every connection.
Proud of the team who made this look easy. It wasn't.